Few cabinet makers put a price on a website. We do, because we have a quoting system that prices every cabinet from its actual parts, and because you should not have to book a site visit to find out whether we are in your budget. The bands below are where our full kitchens usually land for the joinery alone, designed, made and installed, before benchtop stone, appliances and trades. Most kitchens sit inside one of them. A ten-minute form will tell us which, and then we come to you: the site visit is free, and the quote follows on the spot or within 48 hours, because our quoting system prices every cabinet from its parts.
Price bands by style
| Style | Typical range | What pushes it up |
|---|---|---|
| Scandinavian | $36,000 to $52,000 | Island size, tall storage |
| Modern | $38,000 to $55,000 | Integrated appliances, appliance panels, tall storage |
| Industrial | $38,000 to $56,000 | Open cabinets, LED strips, specialty hardware |
| Minimalist | $40,000 to $58,000 | Shadow-line rails, push-to-open, integrated appliances |
| Modern farmhouse | $40,000 to $58,000 | Tall pantry, the sink cabinet, panelled island ends |
| Hamptons and coastal | $42,000 to $60,000 | Glazed uppers, panelled island ends, mouldings |
| Japandi | $42,000 to $60,000 | The tall timber wall, grain matching |
| Traditional classic | $45,000 to $65,000 | Heavy detailed doors, mantle, mouldings |
What is in the number
Design, with drawings you approve before anything is cut. Every cabinet, door, drawer, panel and kicker, made in our Malaga workshop. Hinges, runners and handles. Delivery, installation, and the site visits to measure and to hand over. The guarantee. In other words, everything that is ours to control.
What is not, and why
Benchtop stone is priced per slab by the stone company on the day, and for the same kitchen in 2026 it varies from about $4,000 for the plainest stone to $12,000, depending on what you choose; a laminate top starts nearer $2,500. Once the cabinets are in, the stone company templates, cuts and fits the slab, and we are there for the handover. You can buy the stone from them directly, or we manage it for you, in which case we add 20 per cent to their price for the coordination and for carrying the guarantee on it. Appliances are yours to buy, and we tell you which models fit. Trades such as plumbing, electrical, tiling and painting are quoted by the licensed tradespeople we work with. You can book them yourself, or we manage them for you and add 15 to 20 per cent to their invoices for doing so.
The things that move the price most
- The island. Its length, its ends and its drawers move our number more than any other cabinet. A waterfall stone end is on the stone bill, not ours, and it is the dearest thing you can add there; a panelled end is joinery and costs less.
- The door. A flat front is the cheapest to make; a Shaker is more; a heavy detailed 21 mm door with a beaded frame is the most. The door profiles page shows every one we offer.
- Appliances hidden or on show. Most integrated appliances need a panel, a cabinet and a panel-ready appliance; a dishwasher needs only the panel.
- A scullery. Adds $9,000 to $22,000, and usually takes some cost out of the main kitchen. See the scullery page.
- Tall storage. Floor-to-ceiling cabinets cost more per metre than base and upper runs, because a tall run carries about three times the front area of a base run.
Where the money goes
You are not paying for a showroom or a sales team. The people who draw your kitchen make it and fit it, and the price is for the kitchen: one designed for your room and your habits, made with 18 or 21 mm thermolaminated fronts rather than 16 mm melamine board, with drawers on Blum LEGRABOX, Blum MERIVOBOX or Finista Edge runners, soft close in every case and chosen to the budget, installed by the people who made it. If the budget is well under these bands, we will say so at the first call rather than after a site visit.
What we take on
Kitchens first, in new builds and renovations, and the laundry, wardrobes or matching pieces that come with them. We do not do facelifts, or bathrooms on their own, and we rarely take a job under $15,000, because the way we work does not make sense at that size.
Money and timing
A 10 per cent deposit when you approve the quote, and the balance in stages as the work is done. Four to six weeks from signed drawings to installation, then two to four weeks for the stone company to template, cut and fit the benchtop, which is the normal Perth lead time for stone. Any change after sign-off is written down and priced before the work moves. The quote sets out what is included and what is not. You are welcome at the Malaga workshop while your kitchen is being made, though it is a workshop, not a showroom.